Millstone’s Unit 2 back in operation

Aug 27th, 2012 | By | Category: General

Waterford – Unit 2 at the Millstone Power Station returned to full operations on Saturday, after a 12-day shutdown due to high water temperatures in Long Island Sound.

For more on this story, visit: The Day – Millstone’s Unit 2 back in operation | News from southeastern Connecticut.

Be Sociable, Share!
Tags:

Leave a Comment